We finally poured our last foundations today. It was a huge pour. It took all day and most of the evening to finish getting the forms ready and then pour the concrete and place the knife plates onto the foundation.
Tristan (T1T2)

2.24.2006


"Flexcrete" and rammed earth.
Tristan (T1T2)

You might be wondering if a grown man can fit inside of a 2'x2'x12" box...
Tristan (T1T2)

2.22.2006


I had to leave my wife for 2 weeks again. Sad. So, I'm back down in Bluff. The rammed earth wall is pretty much finished, so I worked on finishing some formwork for the foundations that go around the RE wall. The first blocks were laid for the other walls today as well. Check the BluffBlog for more pictures. Tomorrow I may be welding up some plates for some columns to attach to.
Tristan (T1T2)

2.21.2006

all lit up

With the lights on. Posted by Picasa

Final Kitchen addition?

This is the latest addition to our kitchen. It wasn't the funnest thing to install, but as Terri put it, "it really pulls the kitchen together". Posted by Picasa

2.20.2006


The completely installed, fantastically new, super cleaning machine.
T1T2

Here I am in the process of installing a new dishwasher in our kitchen. It was a very serious affair.
T1T2

Crazy, crazy Denali playing with one of her Christmas toys that she got from Terri's sister, Emily.
T1T2

2.17.2006

To answer a previous comment...

As to whether or not the painting in the dining room is one that Terri bought...
We first tried to take down the painted-over wallpaper that was in the room, only to find this crazy wallpaper underneath. We cut out a square, because we had already started but decided we didn't want to take the time to do the whole room. So, we found a frame and some paint that matched the wallpaper, painted the room, and hung a frame on the wall.

1 OF 2

This was the first image in the series. Posted by Picasa

2.14.2006

Dining Room Paint

Like our friends Kris and Ron (and their super cool house blog), I wanted to let you know what paint colors we used. The green in the dining room is Sherwin-Williams Ryegrass #6423. We used a green two shades lighter in the entry way (SW Celery #6421).

PS - we used the SW environmentally-friendly "harmony" paint line and LOVED it.

Here is our recently painted dining room. It looks great, except for the temporary dining room table. My next task is to design and build a new one.
T1T2

2.11.2006


We worked so hard these last two weeks that we actually had time to take today off. So we all headed down to Canyon de Chelly in AZ to check out some spectacular Indian ruins and artwork. This is the White House which has ruins at ground level as well as in the cliff.
T1T2

2.10.2006


The Rammed Earth Wall is finally done! It is so beautiful. We took the supports out of the steel openings and revealed the entire wall today. Everything looks fantastic. Check out the BluffBlog to see some more of our handywork.
T1T2

I miss my wife.
T1T2

A late night at the site. The rammed earth wall is finished, but the forms are still up.
T1T2

Standing on top of the rammed earth wall.
T1T2

2.08.2006


So, there have been a lot of questions as to what exactly is Rammed Earth. Well, I'll tell you. It's pretty amazing stuff, all it is is a mixture of different types of soil that is compacted/rammed into a form. Think of making a really nice sand castle. The key to making it work is having the correct mixture of sand, gravel, and most importantly, CLAY. Ideally you want between 20-40% clay in your soil. The clay binds the sand and other aggregate together. Cement may also be added as a stabilizer if there isn't enough clay in the mixture. For our rammed earth (RE) walls we have about a 30% clay soil content. It took forever to find the right color and clay content. So, our mixture for the wall is a 45% sand and 30% clay mixture with about 12.5% cement and 12.5% road base gravel. You mix this all together and add just enough water to make the mixture ball together in your hand. It is a very dry mixture. This is poured into the forms about 8 inches at a time and then is rammed down with a pneumatic or hand tamper. That is what creates the layers in the wall. The gray layers were done with a different soil clay mixture that had a little less clay, which we compensated for with more cement. I hope that clears up what RE is.
T1T2

Here is the newest RE wall. The pipes sticking through are going to be used to hold the formwork for the final middle section. By Friday we should have this wall finished.
T1T2